How many employees are needed to operate the entire cement f
The number of operators for the entire cement fiberboard production line mainly depends on the automation level of the production line,production capacity scale and production mode(such as single-shift system or three-shift system),and the differences are significant.
Traditional semi-automated production lines rely on manual labor to complete core processes such as batching,transportation,and quality inspection.The degree of equipment automation is low,and a single shift requires 12 to 18 people.Three to four people are needed for the raw material pretreatment stage.Four to five people are needed for the forming and pressing process.2 to 3 people are needed for the curing and drying process.2 to 3 people are needed for the cutting and post-processing stage.Assist and manage 1-3 people.
After the introduction of automatic batching,robot palletizing and other equipment in the automated production line,manual labor is mainly responsible for monitoring and abnormal handling,with a single shift requiring 6 to 10 people.Raw materials and ingredients:1-2 people;2-3 people are needed for molding and transportation.One person for maintenance and drying;Cutting and sorting 1-2 people;Equipment maintenance and management:1-2 people.
After integrating industrial Internet,AI decision-making and digital twin technology,the intelligent cement fiberboard production line has achieved"fully automatic operation+remote monitoring",with only 3 to 5 people required per shift.1-2 people for the central control monitoring position;1-2 on-site support positions;One position for equipment maintenance.